Hello

Summer 2017 has brought about time to finish up the last jobs of the construction project.  After the paving of the parking lot, lines were painted on for parking spaces.  John and Tim placed the river rock neatly around the fire hydrant, and alongside the building.  Shrubs and grasses were planted.  A new sign was installed.  And inside, tiles in the Street and hallways were replaced with carpet tiles.  Thanks to Doug Kuyvenhoven for his efforts in getting all the last details finished and looking great!